PEB Tracker

ranger2992

PEB Forum Veteran
#1
As promised, here is the new PEB tracker. I changed things up a little bit. I added a chart that will give you a quick snapshot of average times and removed a few rcolumns.

Please keep your posts in this thread to timelines only. It is not for asking questions, or making comments. Anything of that sort will be deleted. If you have a question, make your own thread. Don't clutter this one.

Another change I want to make is to include all branches of service. Once we get enough data, I will be able to chart the differences between branches.

Lastly, I want to thank and recognize Huckleback for starting this chart and maintaining it for so many months. I wish him the best in his well deserved retirement.

Please provide your data in this format. Just copy and paste, and throw your info after each item. If you see your name on the tracker and there is yellow, it means I need an update if you have it. Please get that stuff to me so we can provide accurate information.

Member Name:
Post:
PEB:
Unfit Memo:
VA Proposed Ratings:
Signed 199:
Received Orders:
Retirement or Severance:
TDRL or PDRL
DOD%:
VA %:

Please feel free to private message me any concerns or questions.

Joe
 

Attachments

EODStew24

PEB Forum Veteran
#2
EODStew24
Fort Irwin (MEB location)
JBLM (PEB)
1 Nov. 2012 Unfit Memo
28 Jan 2013 VA Proposed Ratings
4 Feb. 2013 199 will be received VIA email. (was contacted by Lead PEBLO that 199 was ready)
 

ranger2992

PEB Forum Veteran
#5
I am not going to go through your sigs to get the data. Please just provide the data in the format I asked for. I really don't have the extra time to weed through all the extra stuff. Please don't reply, just hit "edit" and you can fix it.

Joe
 

Sicotic

PEB Forum Veteran
Registered Member
#6
Member Name: Sicotic
Post: Fort Wainwright
PEB: Seattle
Unfit Memo: Jan 11, 2013
VA Proposed Ratings:
Signed 199:
Received Orders:
Retirement or Severance:
TDRL or PDRL
DOD%:
VA %:
 

Josh Martsch

Registered Member
#7
Sorry for the extra info, but we don't get told a ton as the process is going on...just when it's done. Our process does seem to go rather quickly and effortlessly, though.

Member Name: Josh Martsch
Post: MCAGCC - 29 Palms - MCCES (USMC)
PEB: NCPB - 09 October 2012 (MEB initiated at Balboa Naval Hospital on 06 June 2012)
Unfit Memo: 10 October 2012 (never received separately...just the entire PEB/VA package at one time)
VA Proposed Ratings: 10 October 2012 (looks like the VA was done on 04 October, I just wasn't notified until later)
Signed 199: 12 October 2012
Received Orders: (this is a guess, as I can't remember) Approx 30 October 2012 for a new EAS of 30 Dec 2012
Retirement or Severance: Severance (sent from DFAS 30 Dec 2012...hit bank 14 Jan 2013)
TDRL or PDRL: Neither
DOD%: 10%
VA %: 80% (and not currently recouping severance due to the 80% staying solid with or without unfitting condition).
 

SPC Leggett

Registered Member
#8
May 2012- Sent to WTB
July 2012- Referred to begin MEB
Aug 16 2012- Initial MEB appointment
September 2012- C&P appointments
October 1 2012- Signed my NARSUM
October 9 2012- NARSUM fowarded to PEB (Doc took 8 days to sign my LOD report)
November 6, 2012- found unfit( PEB system was down for 3 weeks )
November 9, 2012- pending decision approval
December 31, 2012- Va sent ratings to PEB
Jan 15, 2013- 199 typed up
Jan 16, 2013- Signed 199 100% DOD 100% VA P&T
Jan 16, 2013- VA exit exam
Jan 22,2013- Transpoc List
Feb 4, 2013- Retirement Brief
Feb 16 2013-May 10 2013- Trans Leave and tdy


VA:Seattle
 

Paul in the VANG Band

PEB Forum Veteran
Registered Member
#9
Sorry about wrong format..
Member Name: Paul in the VANG Band
Post: VANG, Clifton Forge VA / MEB through FT Gordon, GA.
PEB: FT SAM Houston Aug 18, 2012
Unfit Memo: Sept 19,2012
VA Proposed Ratings: Still waiting.......
Signed 199:
Received Orders:
Retirement or Severance:
TDRL or PDRL
DOD%:
VA %
 

J-MN

PEB Forum Veteran
Registered Member
#10
Member Name: J-MN
Post: MN - ANG
PEB: 15MAR12
Unfit Memo: 15JUN12
VA Proposed Ratings: 18DEC12
Signed 199: 21DEC12
Received Orders: 10JAN13
Retirement or Severance: Retirement
TDRL or PDRL: PDRL
DOD%: 30%
VA %: 70%
 

gracieschade

Registered Member
#12
Member Name: gracieschade
Post: Fort Campbell
PEB: 7JAN13
Unfit Memo: 14JAN13
VA Proposed Ratings:
Signed 199:
Received Orders:
Retirement or Severance:
TDRL or PDRL
DOD%:
VA %:
 

EODStew24

PEB Forum Veteran
#13
EODStew24
Fort Irwin (MEB location)
JBLM (PEB)
1 Nov. 2012 ----------Unfit Memo
28 Jan 2013 ----------VA Proposed Ratings
4 Feb. 2013 ---------- Signed 199
Retirement
TDRL
DOD-60%
VA-90%
 

UniformedSoldier

PEB Forum Veteran
Registered Member
#14
Member name: UniformedSoldier
MEB: Fort Knox, KY
PEB: Arlington, VA
Unfit memo: 12 Sep 2012
VA Prposed Ratings: 7 Jan 2012
DoD: 70% TDRL
VA:80%
Signed 199: Requested FPEB 17 Jan 2013
FPEB: Scheduled for 15 Feb 2013
 

Bringers

PEB Forum Veteran
#15
Member Name: Bringers
MEB: Fort Knox, KY
PEB: National Capital Region
Unfit Memo: 20NOV12
VA Proposed Ratings: 08DEC12
Signed 199: 04JAN13
Received Orders: 05FEB13
Retirement
PDRL
DOD%: 50
VA %:50
 

ranger2992

PEB Forum Veteran
#19
Ranger, are you wanting to know the total days we've been in the process or would that be to much to track?
I could add a "PEBLO counseling date" which is the official kick off of the MEB/PEB and then add a total start to finish block. That would be value added. I just want to be careful not to add to much information because then it becomes confusing and difficult for people to understand.

Joe
 

UniformedSoldier

PEB Forum Veteran
Registered Member
#20
I understand your concern about to much information becoming confusing. I just figured it would be of some value to kind of track the overall length of the process, especially for those who are in the beginning stage
 
data-matched-content-ui-type="image_stacked" data-matched-content-rows-num="3" data-matched-content-columns-num="1" data-ad-format="autorelaxed">