Warrior644's DoD IDES MEB/PEB Timeline...

Warrior644

Super Moderator
Staff Member
PEB Forum Veteran
Lifetime Supporter
Registered Member
DoD IDES MEB/PEB timeline:

SSA SSDI filing date via online_____________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior______:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012

DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo______________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed____________:12/26/2012
Army MEB Rebuttal approval_______________:01/04/2013
MEB DA Form 3947 (amended)_____________:01/07/2013
MEB DA 3947 (amended) signed____________:01/08/2013
Army L3/S3 Profile updated by MEB__________:01/10/2013
MEB DA 3947 (original) resigned____________:01/11/2013
Army PEB Unfit Memorandum______________:01/22/2013
DoVA proposed ratings received_____________:04/05/2013
DA Form 199 received____________________:04/05/2013
DoD 60% TDRL & DoVA 100%_____________:04/05/2013
DA Form 199 signed______________________:04/15/2013
Demand FPEB & DoVA reconsideration________:04/15/2013
DA Form 199 (signed) to USAPDA___________:04/16/2013
IPEB reaffirmed findings with denial__________:04/23/2013
Notification of Formal PEB hearing___________:04/26/2013
Contacted by SPEBC from NCRPEB___________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting________:05/09/2013
Formal PEB hearing demand withdrawn_______:05/13/2013
Revised VARR request memo to SPEBC_______:06/13/2013
Official VARR request to DoVA D-RAS________:06/18/2013
Received copy of official VARR request_______:08/07/2013
DoVA revised proposed ratings received______:09/06.2013
Notification on receipt of revised DA Form 199_:09/06/2013
Reconsideration #1 DA Form 199 received____:09/09/2013
DoD 70% TDRL & DoVA 100%_____________:09/09/2013
DA Form 199 reconsideration #1 signed______:09/18/2013
Demand 2nd FPEB & DoVA reconsideration____:09/18/2013
Recon#1 DA 199 (signed) to USAPDA_______:09/19/2013
IPEB reaffirmed Recon#1 findings with denial__:11/15/2013
Notification of 2nd Formal PEB hearing_______:11/19/2013
2nd Formal PEB hearing completed__________:12/16/2013
Notification of 2nd FPEB hearing results_______:12/19/2013
2nd FPEB hearing appeal submission due______:12/26/2013
Notification of 2nd FPEB hearing extension____:12/30/2013
DA Form 199-1 Formal #1 signed___________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB__:01/08/2014
DoVA face-to-face exit interview with MSC____:01/16/2014
HQ USAPDA review and SecArmy Approval____:02/10/2014
Officially cleared CIF with memorandum only___:02/12/2014
Received notification of TRANSPOC-III message_:02/25/2014
Walk-in appointment with military RSO________:02/25/2014
Received military disability retirement orders____:02/28/2014
Final out date from Active Duty military unit____:03/05/2014
Received official DD Form 214 from RSO_______:03/05/2014
Official military disability orders sent to PEBLO___:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO___:03/05/2014
Officially start military TDR transition leave______:03/06/2014
Last day on Active Duty in U.S. Military________:05/26/2014
Placement onto the military TDRL____________:05/27/2014


DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS


DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!


DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

----------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:


DoD 70% TDRL & DoVA 100%_______________:08/01/2014
Received Official DoVA final ratings____________:08/13/2014

DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Awaiting official correspondence for military TDRL re-evaluation.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
UPDATE #1

DoD IDES MEB/PEB timeline:

SSA SSDI filing date via online______________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior_____:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling_____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012
DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo_____________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed_____________:12/26/2012
Army MEB Rebuttal approval_________________:01/04/2013
MEB DA Form 3947 (amended)_______________:01/07/2013
MEB DA 3947 (amended) signed______________:01/08/2013
Army L3/S3 Profile updated by MEB____________:01/10/2013
MEB DA 3947 (original) resigned_______________:01/11/2013
Army PEB Unfit Memorandum________________:01/22/2013
DoVA proposed ratings received_______________:04/05/2013
DA Form 199 received______________________:04/05/2013
DoD 60% TDRL & DoVA 100%_______________:04/05/2013
DA Form 199 signed________________________:04/15/2013
Demand FPEB & DoVA reconsideration_________:04/15/2013
DA Form 199 (signed) to USAPDA_____________:04/16/2013
IPEB reaffirmed findings with denial____________:04/23/2013
Notification of Formal PEB hearing_____________:04/26/2013
Contacted by SPEBC from NCRPEB____________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting__________:05/09/2013
Formal PEB hearing demand withdrawn_________:05/13/2013
Revised VARR request memo to SPEBC________:06/13/2013
Official VARR request to DoVA D-RAS__________:06/18/2013
Received copy of official VARR request_________:08/07/2013
DoVA revised proposed ratings received________:09/06.2013
Notification on receipt of revised DA Form 199___:09/06/2013
Reconsideration #1 DA Form 199 received______:09/09/2013
DoD 70% TDRL & DoVA 100%_______________:09/09/2013
DA Form 199 reconsideration #1 signed________:09/18/2013
Demand 2nd FPEB & DoVA reconsideration______:09/18/2013
Recon#1 DA 199 (signed) to USAPDA__________:09/19/2013
IPEB reaffirmed Recon#1 findings with denial_____:11/15/2013
Notification of 2nd Formal PEB hearing__________:11/19/2013
2nd Formal PEB hearing completed_____________:12/16/2013
Notification of 2nd FPEB hearing results_________:12/19/2013
2nd FPEB hearing appeal submission due________:12/26/2013
Notification of 2nd FPEB hearing extension_______:12/30/2013
DA Form 199-1 Formal #1 signed________________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB_____:01/08/2014
DoVA face-to-face exit interview with MSC_________:01/16/2014
HQ USAPDA review and SecArmy Approval________:02/10/2014
Officially cleared CIF with memorandum only_______:02/12/2014
Received notification of TRANSPOC-III message____:02/25/2014
Walk-in appointment with military RSO_____________:02/25/2014
Received military disability retirement orders________:02/28/2014
Final out date from Active Duty military unit________:03/05/2014
Received official DD Form 214 from RSO__________:03/05/2014
Official military disability orders sent to PEBLO_______:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO______:03/05/2014
Officially start military TDR transition leave_________:03/06/2014
Updated DD Form 214 to MSC via PEBLO via RSO__:04/23/2014
Last day on Active Duty in U.S. Military___________:05/26/2014
Placement onto the military TDRL________________:05/27/2014

DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS

DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!

DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

-----------------------------------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:

DoVA rating decision document__________________06/27/2014
DoD 70% TDRL & DoVA 100% awarded__________:08/01/2014
DoVA official decision letter_____________________:08/06/2014
Received DoVA final ratings_____________________:08/13/2014


Submit DoVA Notice of Disagreement (NOD) (VA Form 21-0958)__________: TBD
Submit CRSC application (DD Form 2860)_____________________________: TBD
Submit DoVA Family Caregivers application (VA Form 10-10CG)____________: TBD
Submit DoVA Annual Clothing Allowance application (VA Form 10-8678)_____: TBD
Submit S-DVI application (VA Form 29-4364)__________________________: TBD
Submit Supplemental S-DVI application (VA Form 29-0188)_______________: TBD


DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Awaiting official correspondence for military TDRL re-evaluation.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
Post IDES timeline is very helpful for the rest of us not too far behind you, thanks Warrior for continuing to stay involved with the site.
 
Post IDES timeline is very helpful for the rest of us not too far behind you, thanks Warrior for continuing to stay involved with the site.

No worries; you (and all other PEB Forum members) are quite welcome indeed! ;)

With that said, it's definitely an honor to continue to do so! :D Take care and thanks! :cool:

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
DoD IDES MEB/PEB timeline:

SSA SSDI filing date via online_____________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior______:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012

DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo______________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed____________:12/26/2012
Army MEB Rebuttal approval_______________:01/04/2013
MEB DA Form 3947 (amended)_____________:01/07/2013
MEB DA 3947 (amended) signed____________:01/08/2013
Army L3/S3 Profile updated by MEB__________:01/10/2013
MEB DA 3947 (original) resigned____________:01/11/2013
Army PEB Unfit Memorandum______________:01/22/2013
DoVA proposed ratings received_____________:04/05/2013
DA Form 199 received____________________:04/05/2013
DoD 60% TDRL & DoVA 100%_____________:04/05/2013
DA Form 199 signed______________________:04/15/2013
Demand FPEB & DoVA reconsideration________:04/15/2013
DA Form 199 (signed) to USAPDA___________:04/16/2013
IPEB reaffirmed findings with denial__________:04/23/2013
Notification of Formal PEB hearing___________:04/26/2013
Contacted by SPEBC from NCRPEB___________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting________:05/09/2013
Formal PEB hearing demand withdrawn_______:05/13/2013
Revised VARR request memo to SPEBC_______:06/13/2013
Official VARR request to DoVA D-RAS________:06/18/2013
Received copy of official VARR request_______:08/07/2013
DoVA revised proposed ratings received______:09/06.2013
Notification on receipt of revised DA Form 199_:09/06/2013
Reconsideration #1 DA Form 199 received____:09/09/2013
DoD 70% TDRL & DoVA 100%_____________:09/09/2013
DA Form 199 reconsideration #1 signed______:09/18/2013
Demand 2nd FPEB & DoVA reconsideration____:09/18/2013
Recon#1 DA 199 (signed) to USAPDA_______:09/19/2013
IPEB reaffirmed Recon#1 findings with denial__:11/15/2013
Notification of 2nd Formal PEB hearing_______:11/19/2013
2nd Formal PEB hearing completed__________:12/16/2013
Notification of 2nd FPEB hearing results_______:12/19/2013
2nd FPEB hearing appeal submission due______:12/26/2013
Notification of 2nd FPEB hearing extension____:12/30/2013
DA Form 199-1 Formal #1 signed___________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB__:01/08/2014
DoVA face-to-face exit interview with MSC____:01/16/2014
HQ USAPDA review and SecArmy Approval____:02/10/2014
Officially cleared CIF with memorandum only___:02/12/2014
Received notification of TRANSPOC-III message_:02/25/2014
Walk-in appointment with military RSO________:02/25/2014
Received military disability retirement orders____:02/28/2014
Final out date from Active Duty military unit____:03/05/2014
Received official DD Form 214 from RSO_______:03/05/2014
Official military disability orders sent to PEBLO___:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO___:03/05/2014
Officially start military TDR transition leave______:03/06/2014
Last day on Active Duty in U.S. Military________:05/26/2014
Placement onto the military TDRL____________:05/27/2014


DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS


DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!


DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

----------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:


DoD 70% TDRL & DoVA 100%_______________:08/01/2014
Received Official DoVA final ratings____________:08/13/2014

DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Awaiting official correspondence for military TDRL re-evaluation.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!


Warrior 644 you seem to know alot about this process... I have a few questions...Just hit TRASPOC 100% DOD and 100% VA TDRL and have to have reeval for PTSD by VA and Army...is there any key things i need to make sure I do now...I will be clearing in the next few days...How long until VA benifits kick in...Any advice would be appreciated...Also when can I put in for SSDI... I am on leave until 16 Dec 14...thanks ss
 
Warrior 644 you seem to know alot about this process... I have a few questions...Just hit TRASPOC 100% DOD and 100% VA TDRL and have to have reeval for PTSD by VA and Army...is there any key things i need to make sure I do now...I will be clearing in the next few days...How long until VA benifits kick in...Any advice would be appreciated...Also when can I put in for SSDI... I am on leave until 16 Dec 14...thanks ss

Welcome to the PEB Forum! :)

Indeed, congratulations on your DoD and DoVA proposed ratings to include the forthcoming military disability retirement albeit placement onto the TDRL! :D

From my experiences, I offer the following responses to your specific inquiry:

Q1. Is there any key things i need to make sure I do now?
A1a. Indeed, please obtain a copy of your official military healthcare records to include all civilian healthcare providers and/or civilian emergency room/department visits.
A1b. Upon receipt of your DD Form 214, upload an e-copy into your DoVA case file via eBenefits as a contingency.
A1c. If you have any dependants, please ensure to complete the required DoVA documentation PRIOR to official placement onto the military TDRL (e.g., do it while still in the military on active duty). Also, upload an e-copy into your DoVA case file via eBenefits as a contingency.

Q2. How long until VA benifits kick in?
A2. In my particular case, I started to receive DoVA compensation after three months of being placed onto the military TDRL.

Q3. Also when can I put in for SSDI...?
A3a. You can apply for SSA SSDI as a Wounded Warrior at anytime albeit the sooner the better in order to establish and secure the filing date for any potential back payment at this point.
A3b. That said; please review my URL at http://www.pebforum.com/site/threads/social-security-administration-ssa-social-security-disability-insurance-ssdi-compensation.24005/ for detailed information.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
UPDATE #2

DoD IDES MEB/PEB timeline:

SSA SSDI filing date via online______________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior_____:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling_____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012
DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo_____________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed_____________:12/26/2012
Army MEB Rebuttal approval_________________:01/04/2013
MEB DA Form 3947 (amended)_______________:01/07/2013
MEB DA 3947 (amended) signed______________:01/08/2013
Army L3/S3 Profile updated by MEB____________:01/10/2013
MEB DA 3947 (original) resigned_______________:01/11/2013
Army PEB Unfit Memorandum________________:01/22/2013
DoVA proposed ratings received_______________:04/05/2013
DA Form 199 received______________________:04/05/2013
DoD 60% TDRL & DoVA 100%_______________:04/05/2013
DA Form 199 signed________________________:04/15/2013
Demand FPEB & DoVA reconsideration_________:04/15/2013
DA Form 199 (signed) to USAPDA_____________:04/16/2013
IPEB reaffirmed findings with denial____________:04/23/2013
Notification of Formal PEB hearing_____________:04/26/2013
Contacted by SPEBC from NCRPEB____________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting__________:05/09/2013
Formal PEB hearing demand withdrawn_________:05/13/2013
Revised VARR request memo to SPEBC________:06/13/2013
Official VARR request to DoVA D-RAS__________:06/18/2013
Received copy of official VARR request_________:08/07/2013
DoVA revised proposed ratings received________:09/06.2013
Notification on receipt of revised DA Form 199___:09/06/2013
Reconsideration #1 DA Form 199 received______:09/09/2013
DoD 70% TDRL & DoVA 100%_______________:09/09/2013
DA Form 199 reconsideration #1 signed________:09/18/2013
Demand 2nd FPEB & DoVA reconsideration______:09/18/2013
Recon#1 DA 199 (signed) to USAPDA__________:09/19/2013
IPEB reaffirmed Recon#1 findings with denial_____:11/15/2013
Notification of 2nd Formal PEB hearing__________:11/19/2013
2nd Formal PEB hearing completed_____________:12/16/2013
Notification of 2nd FPEB hearing results_________:12/19/2013
2nd FPEB hearing appeal submission due________:12/26/2013
Notification of 2nd FPEB hearing extension_______:12/30/2013
DA Form 199-1 Formal #1 signed________________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB_____:01/08/2014
DoVA face-to-face exit interview with MSC_________:01/16/2014
HQ USAPDA review and SecArmy Approval________:02/10/2014
Officially cleared CIF with memorandum only_______:02/12/2014
Received notification of TRANSPOC-III message____:02/25/2014
Walk-in appointment with military RSO_____________:02/25/2014
Received military disability retirement orders________:02/28/2014
Final out date from Active Duty military unit________:03/05/2014
Received official DD Form 214 from RSO__________:03/05/2014
Official military disability orders sent to PEBLO_______:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO______:03/05/2014
Officially start military TDR transition leave_________:03/06/2014
Updated DD Form 214 to MSC via PEBLO via RSO__:04/23/2014
Last day on Active Duty in U.S. Military___________:05/26/2014
Placement onto the military TDRL________________:05/27/2014

DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS

DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!

DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

-----------------------------------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:

DoVA rating decision document_________________________________________:06/27/2014
DoD 70% TDRL & DoVA 100% awarded_________________________________:08/01/2014
DoVA official decision letter_____________________________________________:08/06/2014
Received DoVA final ratings_____________________________________________:08/13/2014
Submitted DoVA Family Caregivers application (VA Form 10-10CG)_____________:09/19/2014

Submit CRSC application (DD Form 2860)_________________________________: TBD
Submit DoVA Notice of Disagreement (NOD) (VA Form 21-0958)_____________: TBD
Submit DoVA Annual Clothing Allowance application (VA Form 10-8678)_________: TBD
Submit S-DVI application (VA Form 29-4364)_____________________________: TBD
Submit Supplemental S-DVI application (VA Form 29-0188)__________________: TBD


DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Awaiting official correspondence for military TDRL re-evaluation.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
UPDATE #3

DoD IDES MEB/PEB timeline:

SSA SSDI filing date via online______________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior_____:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling_____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012
DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo_____________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed_____________:12/26/2012
Army MEB Rebuttal approval_________________:01/04/2013
MEB DA Form 3947 (amended)_______________:01/07/2013
MEB DA 3947 (amended) signed______________:01/08/2013
Army L3/S3 Profile updated by MEB____________:01/10/2013
MEB DA 3947 (original) resigned_______________:01/11/2013
Army PEB Unfit Memorandum________________:01/22/2013
DoVA proposed ratings received_______________:04/05/2013
DA Form 199 received______________________:04/05/2013
DoD 60% TDRL & DoVA 100%_______________:04/05/2013
DA Form 199 signed________________________:04/15/2013
Demand FPEB & DoVA reconsideration_________:04/15/2013
DA Form 199 (signed) to USAPDA_____________:04/16/2013
IPEB reaffirmed findings with denial____________:04/23/2013
Notification of Formal PEB hearing_____________:04/26/2013
Contacted by SPEBC from NCRPEB____________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting__________:05/09/2013
Formal PEB hearing demand withdrawn_________:05/13/2013
Revised VARR request memo to SPEBC________:06/13/2013
Official VARR request to DoVA D-RAS__________:06/18/2013
Received copy of official VARR request_________:08/07/2013
DoVA revised proposed ratings received________:09/06.2013
Notification on receipt of revised DA Form 199___:09/06/2013
Reconsideration #1 DA Form 199 received______:09/09/2013
DoD 70% TDRL & DoVA 100%_______________:09/09/2013
DA Form 199 reconsideration #1 signed________:09/18/2013
Demand 2nd FPEB & DoVA reconsideration______:09/18/2013
Recon#1 DA 199 (signed) to USAPDA__________:09/19/2013
IPEB reaffirmed Recon#1 findings with denial_____:11/15/2013
Notification of 2nd Formal PEB hearing__________:11/19/2013
2nd Formal PEB hearing completed_____________:12/16/2013
Notification of 2nd FPEB hearing results_________:12/19/2013
2nd FPEB hearing appeal submission due________:12/26/2013
Notification of 2nd FPEB hearing extension_______:12/30/2013
DA Form 199-1 Formal #1 signed________________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB_____:01/08/2014
DoVA face-to-face exit interview with MSC_________:01/16/2014
HQ USAPDA review and SecArmy Approval________:02/10/2014
Officially cleared CIF with memorandum only_______:02/12/2014
Received notification of TRANSPOC-III message____:02/25/2014
Walk-in appointment with military RSO_____________:02/25/2014
Received military disability retirement orders________:02/28/2014
Final out date from Active Duty military unit________:03/05/2014
Received official DD Form 214 from RSO__________:03/05/2014
Official military disability orders sent to PEBLO_______:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO______:03/05/2014
Officially start military TDR transition leave_________:03/06/2014
Updated DD Form 214 to MSC via PEBLO via RSO__:04/23/2014
Last day on Active Duty in U.S. Military___________:05/26/2014
Placement onto the military TDRL________________:05/27/2014

DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS

DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!

DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

-----------------------------------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:

DoVA rating decision document_________________________________________:06/27/2014
DoD 70% TDRL & DoVA 100% awarded__________________________________:08/01/2014
DoVA official decision letter_____________________________________________:08/06/2014
Received DoVA final ratings_____________________________________________:08/13/2014
Submitted DoVA Family Caregivers application (VA Form 10-10CG)______________:09/19/2014
Approved for DoVA Family Caregivers Program (albeit an appeal is warranted)____:12/15/2014
Received official notification of scheduling for military TDRL re-evaluation________:12/16/2014.

Submit CRSC application (DD Form 2860)_________________________________: TBD
Submit DoVA Notice of Disagreement (NOD) (VA Form 21-0958)_______________: TBD
Submit DoVA Annual Clothing Allowance application (VA Form 10-8678)_________: TBD
Submit S-DVI application (VA Form 29-4364)_______________________________: TBD
Submit Supplemental S-DVI application (VA Form 29-0188)___________________: TBD

DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Scheduled for a military PTSD re-evaluation/examination via a private sub-contractor on 12/31/2014.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
UPDATE #4

DoD IDES MEB/PEB timeline:

SSA SSDI filing date via online______________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior_____:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling_____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012
DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo_____________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed_____________:12/26/2012
Army MEB Rebuttal approval_________________:01/04/2013
MEB DA Form 3947 (amended)_______________:01/07/2013
MEB DA 3947 (amended) signed______________:01/08/2013
Army L3/S3 Profile updated by MEB____________:01/10/2013
MEB DA 3947 (original) resigned_______________:01/11/2013
Army PEB Unfit Memorandum________________:01/22/2013
DoVA proposed ratings received_______________:04/05/2013
DA Form 199 received______________________:04/05/2013
DoD 60% TDRL & DoVA 100%_______________:04/05/2013
DA Form 199 signed________________________:04/15/2013
Demand FPEB & DoVA reconsideration_________:04/15/2013
DA Form 199 (signed) to USAPDA_____________:04/16/2013
IPEB reaffirmed findings with denial____________:04/23/2013
Notification of Formal PEB hearing_____________:04/26/2013
Contacted by SPEBC from NCRPEB____________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting__________:05/09/2013
Formal PEB hearing demand withdrawn_________:05/13/2013
Revised VARR request memo to SPEBC________:06/13/2013
Official VARR request to DoVA D-RAS__________:06/18/2013
Received copy of official VARR request_________:08/07/2013
DoVA revised proposed ratings received________:09/06.2013
Notification on receipt of revised DA Form 199___:09/06/2013
Reconsideration #1 DA Form 199 received______:09/09/2013
DoD 70% TDRL & DoVA 100%_______________:09/09/2013
DA Form 199 reconsideration #1 signed________:09/18/2013
Demand 2nd FPEB & DoVA reconsideration______:09/18/2013
Recon#1 DA 199 (signed) to USAPDA__________:09/19/2013
IPEB reaffirmed Recon#1 findings with denial_____:11/15/2013
Notification of 2nd Formal PEB hearing__________:11/19/2013
2nd Formal PEB hearing completed_____________:12/16/2013
Notification of 2nd FPEB hearing results_________:12/19/2013
2nd FPEB hearing appeal submission due________:12/26/2013
Notification of 2nd FPEB hearing extension_______:12/30/2013
DA Form 199-1 Formal #1 signed________________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB_____:01/08/2014
DoVA face-to-face exit interview with MSC_________:01/16/2014
HQ USAPDA review and SecArmy Approval________:02/10/2014
Officially cleared CIF with memorandum only_______:02/12/2014
Received notification of TRANSPOC-III message____:02/25/2014
Walk-in appointment with military RSO_____________:02/25/2014
Received military disability retirement orders________:02/28/2014
Final out date from Active Duty military unit________:03/05/2014
Received official DD Form 214 from RSO__________:03/05/2014
Official military disability orders sent to PEBLO_______:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO______:03/05/2014
Officially start military TDR transition leave_________:03/06/2014
Updated DD Form 214 to MSC via PEBLO via RSO__:04/23/2014
Last day on Active Duty in U.S. Military___________:05/26/2014
Placement onto the military TDRL________________:05/27/2014

DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS

DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!

DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

-----------------------------------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:

DoVA rating decision document_________________________________________:06/27/2014
DoD 70% TDRL & DoVA 100% awarded__________________________________:08/01/2014
DoVA official decision letter_____________________________________________:08/06/2014
Received DoVA final ratings_____________________________________________:08/13/2014
Submitted DoVA Family Caregivers application (VA Form 10-10CG)______________:09/19/2014
Approved for DoVA Family Caregivers Program (albeit an appeal is warranted)____:12/15/2014
Received official notification of scheduling for military TDRL re-evaluation_________:12/16/2014
Completed 6-month PTSD C&P re-exam via QTC Medical Services, Inc for DoVA__:12/31/2014
Submitted Primary Family Caregiver Appeal via DoVA Patient Advocate's Office______:1/22/2015


Submit CRSC application (DD Form 2860)____________________________________: TBD
Submit DoVA Notice of Disagreement (NOD) (VA Form 21-0958)_________________: TBD
Submit DoVA Annual Clothing Allowance application (VA Form 10-8678)____________: TBD
Submit S-DVI application (VA Form 29-4364)_________________________________: TBD
Submit Supplemental S-DVI application (VA Form 29-0188)______________________: TBD

DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Awaiting for the results from the 6-month PTSD C&P re-evaluation/examination as of 12/31/2014.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
Last edited:
Warrior,

Thanks for continuing to keep us updated. Im personally about 2 months now into retirement & not too far behind you.

How was the 6 month re-evaluation? Did it go as you planned? How long did it take? Any tips? I completely dont look forward to the re-evaluation nor any other visits to the VA. Any feedback is appreciated.

Ryan_85
 
Warrior,
I got my letter today from VA 100% PTSD but not permanent have to do a re eval 1 May 15.

We both completed PEB about the same time...Do you have to go for re eval, if so did u and what do I need to expect. I am currently in a 8 week inpatient PTSD program.

I dont mind my PTSD to drop to 70% from 100 because I still have enough other issues to make me 100%

Also retired 29 years TDRL 100% and just got SSDI for PTSD.

Do you know how long to hear back on re eval once it happens with the VA thx
 
UPDATE #5

DoD IDES MEB/PEB timeline:


SSA SSDI filing date via online______________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior_____:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling_____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012
DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo_____________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed_____________:12/26/2012
Army MEB Rebuttal approval_________________:01/04/2013
MEB DA Form 3947 (amended)_______________:01/07/2013
MEB DA 3947 (amended) signed______________:01/08/2013
Army L3/S3 Profile updated by MEB____________:01/10/2013
MEB DA 3947 (original) resigned_______________:01/11/2013
Army PEB Unfit Memorandum________________:01/22/2013
DoVA proposed ratings received_______________:04/05/2013
DA Form 199 received______________________:04/05/2013
DoD 60% TDRL & DoVA 100%_______________:04/05/2013
DA Form 199 signed________________________:04/15/2013
Demand FPEB & DoVA reconsideration_________:04/15/2013
DA Form 199 (signed) to USAPDA_____________:04/16/2013
IPEB reaffirmed findings with denial____________:04/23/2013
Notification of Formal PEB hearing_____________:04/26/2013
Contacted by SPEBC from NCRPEB____________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting__________:05/09/2013
Formal PEB hearing demand withdrawn_________:05/13/2013
Revised VARR request memo to SPEBC________:06/13/2013
Official VARR request to DoVA D-RAS__________:06/18/2013
Received copy of official VARR request_________:08/07/2013
DoVA revised proposed ratings received________:09/06.2013
Notification on receipt of revised DA Form 199___:09/06/2013
Reconsideration #1 DA Form 199 received______:09/09/2013
DoD 70% TDRL & DoVA 100%_______________:09/09/2013
DA Form 199 reconsideration #1 signed________:09/18/2013
Demand 2nd FPEB & DoVA reconsideration______:09/18/2013
Recon#1 DA 199 (signed) to USAPDA__________:09/19/2013
IPEB reaffirmed Recon#1 findings with denial_____:11/15/2013
Notification of 2nd Formal PEB hearing__________:11/19/2013
2nd Formal PEB hearing completed_____________:12/16/2013
Notification of 2nd FPEB hearing results_________:12/19/2013
2nd FPEB hearing appeal submission due________:12/26/2013
Notification of 2nd FPEB hearing extension_______:12/30/2013
DA Form 199-1 Formal #1 signed________________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB_____:01/08/2014
DoVA face-to-face exit interview with MSC_________:01/16/2014
HQ USAPDA review and SecArmy Approval________:02/10/2014
Officially cleared CIF with memorandum only_______:02/12/2014
Received notification of TRANSPOC-III message____:02/25/2014
Walk-in appointment with military RSO_____________:02/25/2014
Received military disability retirement orders________:02/28/2014
Final out date from Active Duty military unit________:03/05/2014
Received official DD Form 214 from RSO__________:03/05/2014
Official military disability orders sent to PEBLO_______:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO______:03/05/2014
Officially start military TDR transition leave_________:03/06/2014
Updated DD Form 214 to MSC via PEBLO via RSO__:04/23/2014
Last day on Active Duty in U.S. Military___________:05/26/2014
Placement onto the military TDRL________________:05/27/2014

DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS

DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!

DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

-----------------------------------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:

DoVA rating decision document_________________________________________:06/27/2014
DoD 70% TDRL & DoVA 100% awarded__________________________________:08/01/2014
DoVA official decision letter_____________________________________________:08/06/2014
Received DoVA final ratings_____________________________________________:08/13/2014
Submitted DoVA Family Caregivers application (VA Form 10-10CG)______________:09/19/2014
Approved for DoVA Family Caregivers Program (albeit an appeal is warranted)____:12/15/2014
Received official notification of scheduling for military TDRL re-evaluation_________:12/16/2014
Completed 6-month PTSD C&P re-exam via QTC Medical Services, Inc for DoVA__:12/31/2014
Submitted Primary Family Caregiver Appeal via DoVA Patient Advocate's Office___________:01/22/2015
Received a 100% PTSD DoVA final rating decision via a 6-month C&P re-exam___________:01/24/2015
Entitlement to SMC-S as based on Aid and Attendance/Housebound granted_____________:01/24/2015
Received Family Caregiver Program "Tier Level" Denial Letter from VAMC Director________:01/26/2015
Submitted Primary Family Caregiver "Tier Level" Appeal to the DoVA VISN 6 Office Staff___:03/19/2015


Submit CRSC application (DD Form 2860)______________________________________: TBD
Submit DoVA Notice of Disagreement (NOD) (VA Form 21-0958)___________________: TBD
Submit DoVA Annual Clothing Allowance application (VA Form 10-8678)______________: TBD
Submit S-DVI application (VA Form 29-4364)___________________________________: TBD
Submit Supplemental S-DVI application (VA Form 29-0188)________________________: TBD

DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Continuing to await the USAPDA NCR PEB to officially adjudicate my 6-month TDRL case file.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
Warrior,

Thanks for continuing to keep us updated. Im personally about 2 months now into retirement & not too far behind you.

How was the 6 month re-evaluation? Did it go as you planned? How long did it take? Any tips? I completely dont look forward to the re-evaluation nor any other visits to the VA. Any feedback is appreciated.

Ryan_85

Indeed, no worries! ;)

Well, my 6-month re-evaluation was performed by a civilian contractor via QTC Medical Services. It went smooth and I felt at-ease during the approximate 60 minute session albeit I wasn't expecting that at all. Moreover, I was given a travel pay mileage check from QTC Medical Services.

That said, hopefully, you shall get a medical provider with similar traits during your forthcoming re-evaluation. Take care and please remain calm!

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
Warrior,
I got my letter today from VA 100% PTSD but not permanent have to do a re eval 1 May 15.

We both completed PEB about the same time...Do you have to go for re eval, if so did u and what do I need to expect. I am currently in a 8 week inpatient PTSD program.

I dont mind my PTSD to drop to 70% from 100 because I still have enough other issues to make me 100%

Also retired 29 years TDRL 100% and just got SSDI for PTSD.

Do you know how long to hear back on re eval once it happens with the VA thx

Welcome to the PEB Forum! :)

Indeed, congratulations on your recent award of DoVA 100% rating for the PTSD medical condition; I too was recently awarded a DoVA 100% PTSD rating with SMC-S entitlement during the 6-month re-evaluation. You can expect to be asked questions related to your medical condition and what you are currently doing for medical treatment to include if you are working or not...at least from my recent experiences.

Also, congrats on your recent award of SSA SSDI! Please ensure to mention that you are on SSDI for PTSD to the medical provider during the PTSD re-evaluation. It seems that a continuation of "not being able to work" is an important factor for a continued high PTSD rating; at least from my experiences during the re-evaluation.

Hmm, I believe I waited about one month before I received my DoVA final decision rating packet in the U.S. mail; not long at all at least from my recent experiences. Hopefully, your experiences with the PTSD re-evaluation shall yield similar results. Take care, and enjoy life!

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
UPDATE #6

DoD IDES MEB/PEB timeline:


SSA SSDI filing date via online______________:07/01/2012
Army P3 Profile initiated by PCM____________:07/13/2012
SSA DDS receipt of SSDI application_________:07/31/2012
Army Unit Commander notified_____________:09/07/2012
SSA SSDI awarded as Wounded Warrior_____:09/14/2012
Army MEB Physician appointed_____________:09/14/2012
Army PEBLO's initial counseling_____________:09/18/2012
DoVA Form 21-0819 completed____________:09/19/2012
DoVA Form 21-4138 completed____________:09/19/2012
DoVA 7 C&P Exams completed_____________:11/05/2012
Army MEB NARSUM dictated_______________:11/08/2012
MEB DA Form 3947 approved______________:11/15/2012
Army MEB IMR request memo_____________:12/05/2012
Army MEB IMR recommendation____________:12/10/2012
Army MEB Soldier's Appeal filed_____________:12/26/2012
Army MEB Rebuttal approval_________________:01/04/2013
MEB DA Form 3947 (amended)_______________:01/07/2013
MEB DA 3947 (amended) signed______________:01/08/2013
Army L3/S3 Profile updated by MEB____________:01/10/2013
MEB DA 3947 (original) resigned_______________:01/11/2013
Army PEB Unfit Memorandum________________:01/22/2013
DoVA proposed ratings received_______________:04/05/2013
DA Form 199 received______________________:04/05/2013
DoD 60% TDRL & DoVA 100%_______________:04/05/2013
DA Form 199 signed________________________:04/15/2013
Demand FPEB & DoVA reconsideration_________:04/15/2013
DA Form 199 (signed) to USAPDA_____________:04/16/2013
IPEB reaffirmed findings with denial____________:04/23/2013
Notification of Formal PEB hearing_____________:04/26/2013
Contacted by SPEBC from NCRPEB____________:04/30/2013
Initial NCRPEB SPEBC lawyer meeting__________:05/09/2013
Formal PEB hearing demand withdrawn_________:05/13/2013
Revised VARR request memo to SPEBC________:06/13/2013
Official VARR request to DoVA D-RAS__________:06/18/2013
Received copy of official VARR request_________:08/07/2013
DoVA revised proposed ratings received________:09/06.2013
Notification on receipt of revised DA Form 199___:09/06/2013
Reconsideration #1 DA Form 199 received______:09/09/2013
DoD 70% TDRL & DoVA 100%_______________:09/09/2013
DA Form 199 reconsideration #1 signed________:09/18/2013
Demand 2nd FPEB & DoVA reconsideration______:09/18/2013
Recon#1 DA 199 (signed) to USAPDA__________:09/19/2013
IPEB reaffirmed Recon#1 findings with denial_____:11/15/2013
Notification of 2nd Formal PEB hearing__________:11/19/2013
2nd Formal PEB hearing completed_____________:12/16/2013
Notification of 2nd FPEB hearing results_________:12/19/2013
2nd FPEB hearing appeal submission due________:12/26/2013
Notification of 2nd FPEB hearing extension_______:12/30/2013
DA Form 199-1 Formal #1 signed________________:01/06/2014
Formal#1 DA Form 199-1 (signed) to NCRPEB_____:01/08/2014
DoVA face-to-face exit interview with MSC_________:01/16/2014
HQ USAPDA review and SecArmy Approval________:02/10/2014
Officially cleared CIF with memorandum only_______:02/12/2014
Received notification of TRANSPOC-III message____:02/25/2014
Walk-in appointment with military RSO_____________:02/25/2014
Received military disability retirement orders________:02/28/2014
Final out date from Active Duty military unit________:03/05/2014
Received official DD Form 214 from RSO__________:03/05/2014
Official military disability orders sent to PEBLO_______:03/05/2014
DD Form 214 sent to MSC via PEBLO via RSO______:03/05/2014
Officially start military TDR transition leave_________:03/06/2014
Updated DD Form 214 to MSC via PEBLO via RSO__:04/23/2014
Last day on Active Duty in U.S. Military___________:05/26/2014
Placement onto the military TDRL________________:05/27/2014

DoD IDES MEB/PEB conditions:
2 referred conditions from DoD - Army
50 claimed conditions for DoVA D-RAS

DoD IDES MEB/PEB total duration:
A glorious 618 calendar days!

DoD IDES MEB/PEB case status:
COMPLETED via placement onto military TDRL.

-----------------------------------------------------------------------------------------------------------------------------------

Post-DoD IDES MEB/PEB timeline:

DoVA rating decision document_________________________________________:06/27/2014
DoD 70% TDRL & DoVA 100% awarded__________________________________:08/01/2014
DoVA official decision letter_____________________________________________:08/06/2014
Received DoVA final ratings_____________________________________________:08/13/2014
Submitted DoVA Family Caregivers application (VA Form 10-10CG)______________:09/19/2014
Approved for DoVA Family Caregivers Program (albeit an appeal is warranted)____:12/15/2014
Received official notification of scheduling for military TDRL re-evaluation_________:12/16/2014
Completed 6-month PTSD C&P re-exam via QTC Medical Services, Inc for DoVA____:12/31/2014
Submitted Primary Family Caregiver Appeal via DoVA Patient Advocate's Office___________:01/22/2015
Received a 100% PTSD DoVA final rating decision via a 6-month C&P re-exam___________:01/24/2015
Entitlement to SMC-S as based on Aid and Attendance/Housebound granted_____________:01/24/2015
Received Family Caregiver Program "Tier Level" Denial Letter from VAMC Director________:01/26/2015
Received official notification that DoVA documents were forwarded to the NCR PEB_______:02/26/2015
Submitted Primary Family Caregiver "Tier Level" Appeal to the DoVA VISN 6 Office Staff___:03/19/2015
Received telephone call from new PEBLO that (TDRL) DA Form 199 was ready for pickup___:04/23/2015
"DoD 80% PDRL" offered & (DoVA 100% Schedular plus SMC-S previously awarded)______:04/23/2015

Received Family Caregiver Program "Tier Level" Denial Letter from VISN 6 Director_______:04/30/2015

Submit additional DoVA claim for AD medical conditions (prior to one year retirement date)_: TBD
Submit CRSC application (DD Form 2860)_________________________________________: TBD
Submit DoVA Notice of Disagreement (NOD) (VA Form 21-0958)______________________: TBD
Submit DoVA Annual Clothing Allowance application (VA Form 10-8678)________________: TBD
Submit S-DVI application (VA Form 29-4364)______________________________________: TBD
Submit Supplemental S-DVI application (VA Form 29-0188)__________________________: TBD

DoD Legacy PDES (Post-DoD IDES MEB/PEB) case status:
Awaiting reply from USAPDA NCR PEB to officially schedule my FPEB Hearing appeal for the 6-month TDRL adjudication.

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
What are you appealing for the re-eval? Was it not a favorable report?

We haven't even been contacted for it yet (!?)
 
What are you appealing for the re-eval? Was it not a favorable report?

We haven't even been contacted for it yet (!?)

Indeed, the QTC-prepared "PTSD Review Questionnaire" was a very accurately prepared report albeit it's always the USAPDA NCR PEB (IPEB) that can't seem to properly research to obtain their "facts" about my DoD TDRL case file accurately at any given point in time!

That said, I shall not be "forced" into signing an intentionally erroneous DA Form 199 filled with invalidated statements to fabricated assumptions about my current PTSD medical condition! :mad:

Moreover, the IPEB just don't want to provide the "justified and earned" outcome of a DoD 100% rating for PTSD as validated by my current DoVA rating decision versus their non-justified & lowered DoD 70% rating for PTSD; therefore, I MUST fight (again) until the very end! ;)

In retrospect, if you already have received a current DoVA rating decision and/or C&P Examination for the TDRL unfitting medical condition(s) then it's probably beneficial to self-contact the USAPDA (as I did) to inform them of your current situation in order to expedite the TDRL re-evaluation proceedings at this point in time in my opinion.

Take care, and continue to enjoy life! :cool:

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
We have only done the C&P's as a result of a TDIU claim (VA side), not a scheduled exam. That claim is in "Prep for Notification" now and I'm anticipating it closes in the next few days. Also have had to file with BCMR to get the DD214 fixed (another of those "I can't be bothered to take 15 seconds to correct this now, you should instead spend 15 months on the other side trying to get MY mistake corrected" issues - UGH!!!)

If I'm understanding you correctly, your DoD re-eval was done by QTC? If so, I'm wondering if the VA and DOA "share" these exams? (Wishful thinking on my part probably! I just want some permanence now!)
 
We have only done the C&P's as a result of a TDIU claim (VA side), not a scheduled exam. That claim is in "Prep for Notification" now and I'm anticipating it closes in the next few days. Also have had to file with BCMR to get the DD214 fixed (another of those "I can't be bothered to take 15 seconds to correct this now, you should instead spend 15 months on the other side trying to get MY mistake corrected" issues - UGH!!!)

If I'm understanding you correctly, your DoD re-eval was done by QTC? If so, I'm wondering if the VA and DOA "share" these exams? (Wishful thinking on my part probably! I just want some permanence now!)

Indeed, I truly comprehend the overall challenges in trying to get military documentation officially corrected unfortunately! :mad:

Well, actually the DoVA used the QTC contractor for the C&P Examination only (i.e., PTSD Review Questionnaire). Once completed, the QTC medical provider forwarded it to the given mailing address for completion of the VA generated claim.

As such, when I received my new VA rating decision for PTSD, I decided to contact HQ USAPDA and inform them of my completed VA C&P Examination for PTSD, and that I had not been contacted in reference to my 6-month PTSD re-evaluation via the DoD.

Apparently, the DoVA rating decision and VA C&P Examination for PTSD were sufficient documentation for my TDRL re-evaluation; therefore, all documentation were forwarded to USAPDA NCR PEB for TDRL adjudication. Via the available DA Form 199, I was offered a "DoD 80% rating with a PDRL recommended disposition" albeit under falsified statements and erroneous assumptions!

With that all said, I shall accept nothing less than a "DoD 100% rating with a PDRL recommended disposition" as supported and justified via my DoVA rating decision with VA C&P Examination plus all other DoVA inpatient/outpatient medical documentation since placement onto the DoD TDRL.

In summary, it's all about fighting (once again) for a "principle cause" at this point and I shall not back down for anyone! Why, because I have all of the medical evidence in support thereof and the USAPDA NCR PEB (IPEB) only have fabricated & falsified statements at best!

Take care and continue to enjoy life! :cool:

Thus, I quite often comment that "possessing well-informed knowledge is truly a powerful equalizer."

Best Wishes!
 
Thank you so much for the info! I will be trying to follow your lead on this issue. I was hoping it was possible, and with the result of this claim in (just now!) I am going to be bugging you some more to figure out how to do it appropriately!

I don't want to hijack your thread any more than I already have (so sorry!). I'm going to post the status of his claim in my thread in the forum. I'll PM you the link!
 
Top