VA/DoD ratings

ItsADadsLyfe

Well-Known Member
PEB Forum Veteran
Registered Member
I’m not through the MEB phase yet and meeting with attorney this week once I sign and my package gets sent to the PEB how long is it taking for DoD ratings? My claim closed on the VA app last week and I called today to find out my proposed ratings and am happy with them.
 
It can take a while.. Even with VA Ratings before the MEB portion is sent to the PEB. I am now at about a month of waiting. Just check case timeline forums for your branch.
 
It can take a while.. Even with VA Ratings before the MEB portion is sent to the PEB. I am now at about a month of waiting. Just check case timeline forums for your branch.
I am super jealous, I have almost the same timeline excecpt I finished exams sep 2nd, and have absolutely no movement, no narsum, nothing. I keep bugging my Peblo and msc, and the va and still waitiing. I'm starting to go crazy stuck at an SRU
 
I am super jealous, I have almost the same timeline excecpt I finished exams sep 2nd, and have absolutely no movement, no narsum, nothing. I keep bugging my Peblo and msc, and the va and still waitiing. I'm starting to go crazy stuck at an SRU
im frustrated with the waiting too. I got word from my MSC that IPEB deemed unfit, just waiting on ratings. was sent for proposed ratings on the 25th, same day as unfit was determined. called VA this morning and all they said was yeah youre waiting on proposed ratings and they have everthing they need. keep waiting......
 
im frustrated with the waiting too. I got word from my MSC that IPEB deemed unfit, just waiting on ratings. was sent for proposed ratings on the 25th, same day as unfit was determined. called VA this morning and all they said was yeah youre waiting on proposed ratings and they have everthing they need. keep waiting......
I got a message from VA today from askVA, apparently currently timeline is 155days for a claim to go through, so i've got about 30days left, which is funny because the the ideal timeline for MEB is 90days but can run 180....
 
thats the timeline for standard claims to go through, IDES/MEB claims are always processed faster and they dont include those stats in their "processing window"
 
thats the timeline for standard claims to go through, IDES/MEB claims are always processed faster and they dont include those stats in their "processing window"
Yeah I was looking over my welcome email and was reading this
"Our goal is to complete the MEB Phase within 72 calender days
• MTF current average for the MEB Phase is 82 calendar days. •
The goal is to complete the entire process within 180 calendar days for all Soldiers.
• MTF current average for the IDES is 236 calendar days."

Won't be hitting any of those dates sadly.
 
Top