Sharing my timeline so far. Started MEB process for Degenerative Disc Disease, Severe Radiculopathy, and Low Back Pain/Sciatica (3 Separate Claims for DoD Rating)
Had surgery February 2022 for L-4 to S-1 ruptured discs and severe sciatica.
8 Apr: Started MEB Process
13 May: Initial brief with PEBLO
22 May: Legal phone appointment
30 May: First C&P Exam
19 June: Last C&P Exam (7 Total)
All C&P DBQs are showing up on Tricare Online (ToL) with the exception of General (03 June C&P Exam) and Sleep Study (11 June C&P Exam).
I claimed a total of 16 items on the 526EZ.
Had surgery February 2022 for L-4 to S-1 ruptured discs and severe sciatica.
8 Apr: Started MEB Process
13 May: Initial brief with PEBLO
22 May: Legal phone appointment
30 May: First C&P Exam
19 June: Last C&P Exam (7 Total)
All C&P DBQs are showing up on Tricare Online (ToL) with the exception of General (03 June C&P Exam) and Sleep Study (11 June C&P Exam).
I claimed a total of 16 items on the 526EZ.